中文在线三级中文字幕,国产精品白浆流出视频,欧美日韩电影精品视频,91久久国产综合精品,午夜亚洲国产精品福利

      Welcome to BO HAO!

      National Advisory Hotline +86-0750-3597288 +86-18933178298

      BO HAO

      Popular search: Boao Sanitary Hardware, Boao Hardware Package, Jiangmen Pengjiang District Boao Hardware Factory

      Back to home>> your location:Home > News > Industry News

      The installation flow step of domestic shower room

      2019-05-21 11:52:44 來(lái)源:BO HAO http://www.m.soyintech.com/index.php?lang=en Read


      1, the bottom basin that installs good shower room, it is to want the parts of bottom basin to combine above all, the level that decides bottom basin is spent, assure there is no water inside the basin, the pipe wants as far as the distance is close telescopic, connect again pelvic floor and floor drain is firm. If need not the word of bottom basin, the archives water of shower room sticks when wanting to stick ceramic tile stick floor tile, the reason that does so is to have very good water retaining capacity.


      2. Test and protection: after installation, water test shall be carried out to ensure unimpeded launching. Position finding and drilling: determine the drilling position against the wall of aluminum with a pencil and a level rule, and drill holes with a percussion drill. .


      3, installation of aluminum: in the hole into the colloidal particles, aluminum bar with screws locked in the wall.


      4. Fixing glass: clamp the glass in the hole of the bottom basin and fix it with screws.


      5. Installation of pipe jacking: drill holes in the corresponding position above the fixed glass, install (straight/oblique) fixed seat and connect the pipe jacking. Attach it to the top of the glass with a bent sleeve.


      6. Installation rack: measure the correct position and install sanitary ware


      7. Install swing door: install the hardware of swing door, and fix the hinge on the reserved hole of fixed door. Adjust the core position of the lotus leaf after installation until the door closes with the best feeling.


      8, do waterproof: in accordance with the requirements of the glass side or below the installation of suction or water retaining tape. Use silica gel to close the seam between aluminum and wall, glass and bottom basin.


      9. Debugging and fastening: check whether all parts are comfortable and smooth, and timely adjust if problems are found. After adjusting, tighten corresponding screw, make whole shower room firmer.


      10. Finishing work: stick the decorative aluminum strip into the wall aluminum material to ensure its neat and generous appearance. Need to wipe whole wei yu with dishcloth finally clean.


      More+ Recommended Products